Itezhi-Tezhi Water Supply and Sanitation Project

Location

Itezhitezhi, Zambia

Sector

Civil, Mechanical, Chemical, Process and Environmental Engineering

Technology

Dissolved Air Flotation/Advanced

Beneficiaries

120,000

Completion Date

June 2026

Summary Scope of Work

Analysing the feasibility of and designing a water treatment process for a new water treatment works (WTW) to augment ZESCO’s two existing WTW modules. Raw water for the new plant would be abstracted from the Itezhi Tezhi Dam. Assessment of the required distribution and storage infrastructure and environmental and Social Impact Assessment (ESIA) were also done.

 

This involved reviewing the existing operation regime and system design to identify operational and design gaps; conducting field investigations and/or consultations to confirm site conditions, and other technical and human factors that may influence design and construction of the water supply system.

Key Features

  • Environmental and social impact assessment

  • Financial and economic analysis

  • Demand projections

  • Assessment of water quality and existing treatment works performance.

  • Assessment of high lift pumping and distribution and storage network

  • Evaluation of water treatment process options

  • Evaluation of construction phasing options

  • Design of pipeline systems

  • Design of storage tanks

 

Preparation of standard civil, mechanical, electrical and structural drawings