Itezhi-Tezhi Water Supply and Sanitation Project
Location
Itezhitezhi, Zambia
Sector
Civil, Mechanical, Chemical, Process and Environmental Engineering
Technology
Dissolved Air Flotation/Advanced
Beneficiaries
120,000
Completion Date
June 2026
Summary Scope of Work
Analysing the feasibility of and designing a water treatment process for a new water treatment works (WTW) to augment ZESCO’s two existing WTW modules. Raw water for the new plant would be abstracted from the Itezhi Tezhi Dam. Assessment of the required distribution and storage infrastructure and environmental and Social Impact Assessment (ESIA) were also done.
This involved reviewing the existing operation regime and system design to identify operational and design gaps; conducting field investigations and/or consultations to confirm site conditions, and other technical and human factors that may influence design and construction of the water supply system.
Key Features
Environmental and social impact assessment
Financial and economic analysis
Demand projections
Assessment of water quality and existing treatment works performance.
Assessment of high lift pumping and distribution and storage network
Evaluation of water treatment process options
Evaluation of construction phasing options
Design of pipeline systems
Design of storage tanks
Preparation of standard civil, mechanical, electrical and structural drawings